Daily Sabah logo

Politics
Diplomacy Legislation War On Terror EU Affairs Elections News Analysis
TÜRKİYE
Istanbul Education Investigations Minorities Expat Corner Diaspora
World
Mid-East Europe Americas Asia Pacific Africa Syrian Crisis Islamophobia
Business
Automotive Economy Energy Finance Tourism Tech Defense Transportation News Analysis
Lifestyle
Health Environment Travel Food Fashion Science Religion History Feature Expat Corner
Arts
Cinema Music Events Portrait Reviews Performing Arts
Sports
Football Basketball Motorsports Tennis
Opinion
Columns Op-Ed Reader's Corner Editorial
PHOTO GALLERY
JOBS ABOUT US RSS PRIVACY CONTACT US
© Turkuvaz Haberleşme ve Yayıncılık 2025

Daily Sabah - Latest & Breaking News from Turkey | Istanbul

  • Politics
    • Diplomacy
    • Legislation
    • War On Terror
    • EU Affairs
    • Elections
    • News Analysis
  • TÜRKİYE
    • Istanbul
    • Education
    • Investigations
    • Minorities
    • Expat Corner
    • Diaspora
  • World
    • Mid-East
    • Europe
    • Americas
    • Asia Pacific
    • Africa
    • Syrian Crisis
    • Islamophobia
  • Business
    • Automotive
    • Economy
    • Energy
    • Finance
    • Tourism
    • Tech
    • Defense
    • Transportation
    • News Analysis
  • Lifestyle
    • Health
    • Environment
    • Travel
    • Food
    • Fashion
    • Science
    • Religion
    • History
    • Feature
    • Expat Corner
  • Arts
    • Cinema
    • Music
    • Events
    • Portrait
    • Reviews
    • Performing Arts
  • Sports
    • Football
    • Basketball
    • Motorsports
    • Tennis
  • Gallery
  • Opinion
    • Columns
    • Op-Ed
    • Reader's Corner
    • Editorial
  • TV
  • Life
  • Health
  • Environment
  • Travel
  • Food
  • Fashion
  • Science
  • Religion
  • History
  • Feature
  • Expat Corner

More delays as NASA's new moon rocket fails test, goes for repairs

by Agence France-Presse - AFP

WASHINGTON Apr 19, 2022 - 4:26 pm GMT+3
The NASA Artemis rocket with the Orion spacecraft aboard leaves the Vehicle Assembly Building moving slowly on an 11-hour journey to pad 39B at the Kennedy Space Center in Cape Canaveral, Florida, U.S., March 17, 2022. (AP Photo)
The NASA Artemis rocket with the Orion spacecraft aboard leaves the Vehicle Assembly Building moving slowly on an 11-hour journey to pad 39B at the Kennedy Space Center in Cape Canaveral, Florida, U.S., March 17, 2022. (AP Photo)
by Agence France-Presse - AFP Apr 19, 2022 4:26 pm

The flight debut of NASA's mega moon rocket had to be put on hold as the Space Launch System rocket headed back to its assembly building for repairs next week, pushing the earliest possible launch date for its uncrewed test flight to the moon to later this summer after a string of failed fueling tests, officials said Monday.

Since April 1, the space agency has been unsuccessfully attempting a key "wet dress rehearsal" test, so dubbed because it involves loading liquid propellant.

The procedure is meant as a run-through of launch operations, including a final countdown to within 10 seconds before blastoff but without actually firing the engines.

However, NASA teams have encountered several technical hitches.

These included a leak involving flammable liquid hydrogen, a faulty valve that prevented fueling of the upper stage and running low on the supply of nitrogen used to purge oxygen from the rocket prior to tanking operations, for safety reasons.

The rocket, which is 98 meters (322 feet) tall with the Orion crew capsule fixed on top, will begin its slow journey back from Kennedy Space Center's Launch Complex 39B to the vehicle assembly building on April 26, where it will be repaired.

Asked what this might mean for the earliest opportunity to launch the Artemis-1 test flight to the moon and back, senior official Tom Whitmeyer said: "I think the early June window would be challenging."

NASA had previously envisaged a test flight as early as May.

There are subsequent launch windows in July and in August. These depend on factors like the relative positions of the Earth and moon, as well as how long the rocket will have to fly in an eclipse since it requires the sun to keep it powered and thermally regulated.

A delay in Artemis-1 will have a cascading effect on subsequent missions – Artemis-2, the first uncrewed test flight around the moon, and Artemis-3, which will see the first woman and first person of color touch down on the lunar south pole.

NASA wants to build a permanent presence on the moon and use it as a proving ground for technologies necessary for a Mars mission envisioned for some time in the 2030s.

  • shortlink copied
  • KEYWORDS
    space space exploration moon mission nasa space space program
    The Daily Sabah Newsletter
    Keep up to date with what’s happening in Turkey, it’s region and the world.
    You can unsubscribe at any time. By signing up you are agreeing to our Terms of Use and Privacy Policy. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
    No Image
    Full moon lights up Istanbul
    PHOTOGALLERY
    • POLITICS
    • Diplomacy
    • Legislation
    • War On Terror
    • EU Affairs
    • News Analysis
    • TÜRKİYE
    • Istanbul
    • Education
    • Investigations
    • Minorities
    • Diaspora
    • World
    • Mid-East
    • Europe
    • Americas
    • Asia Pacific
    • Africa
    • Syrian Crisis
    • İslamophobia
    • Business
    • Automotive
    • Economy
    • Energy
    • Finance
    • Tourism
    • Tech
    • Defense
    • Transportation
    • News Analysis
    • Lifestyle
    • Health
    • Environment
    • Travel
    • Food
    • Fashion
    • Science
    • Religion
    • History
    • Feature
    • Expat Corner
    • Arts
    • Cinema
    • Music
    • Events
    • Portrait
    • Performing Arts
    • Reviews
    • Sports
    • Football
    • Basketball
    • Motorsports
    • Tennis
    • Opinion
    • Columns
    • Op-Ed
    • Reader's Corner
    • Editorial
    • Photo gallery
    • DS TV
    • Jobs
    • privacy
    • about us
    • contact us
    • RSS
    © Turkuvaz Haberleşme ve Yayıncılık 2021